Skip to main content
(909) 373-7214

ADUs and garage conversions · Inland Empire: A second home on the same lot.

An ADU, sometimes called a granny flat or in-law unit, is a complete, separate home on the same property as a house. There are three common ways to build one, and the right one usually depends on what is already on your lot.

HouseADU
Garage conversion
HouseADU
Attached ADU
HouseADU
Detached ADU

Where each type sits on a typical lot, seen from above, with the ADU in blue. Plan diagrams are simplified illustrations.

What counts as an ADU

California law defines an ADU as an attached or detached residential unit with complete independent living facilities for one or more people, on a lot with a proposed or existing primary residence.

California Government Code §66313, checked October 10, 2026

A junior ADU is smaller, no more than 500 square feet, and sits entirely inside a single-family home.

Garage conversion, attached or detached

The same five questions for each ADU type. None is better in the abstract; the lot usually decides.

Garage conversion

Turn an existing garage into a home.

What changes on the property
The garage becomes living space; its footprint stays recognisable.
What it may suit
You have a garage you can give up and want to reuse an existing structure.
What needs checking first
The condition of the slab, walls and roof, insulation, and where cars will park (state law does not let the city require the lost spaces to be replaced).
What can affect scope and budget
How much of the structure can be kept, raising or insulating the floor, windows and plumbing runs.
A sensible next step
Have the existing garage structure looked at before planning the layout.

Attached ADU

A separate dwelling joined to the house.

What changes on the property
A new, self-contained unit is built against the house, with its own entrance, kitchen and bathroom.
What it may suit
You want a separate home on the property but have limited yard space.
What needs checking first
ADU size and setback rules for your city, fire separation from the main house, utilities and entrances.
What can affect scope and budget
Unit size, the shared wall, utility connections, and city fees that apply to ADUs.
A sensible next step
Confirm what your city allows for attached ADUs on your lot.

Detached ADU

A separate small home in the yard.

What changes on the property
A standalone dwelling is built on the same lot, separate from the main house.
What it may suit
You want privacy between households and have room in the yard.
What needs checking first
Yard space and setbacks, access for construction, utility runs from the street or main house, and trees or slope.
What can affect scope and budget
Unit size, distance for utility lines, site preparation, and finishes.
A sensible next step
Measure the yard and note where utilities enter the property.

Whether a route is allowed on a specific property depends on the lot, the existing structures and the city’s current rules. Nothing here is an eligibility decision, a price or a timeline.

California ADU rules, by type

The short answer comes first; the detail and the source follow. State law sets limits on what a city can require, every ADU must still meet the building code and the health and safety standards for a home, and your city’s ADU ordinance sets the rest.

Four answers homeowners ask for first

  • Setbacks None for a garage converted in place; for a new ADU, no more than four feet at the side and rear. Exceptions apply: front-yard and coastal-zone rules can still affect where it goes. Garage-conversion ruleNew-ADU setback rule
  • Garage parking When a garage becomes an ADU, the city cannot require the lost parking to be replaced. Full parking rule
  • Impact fees None for an ADU of 750 square feet of interior living space or less. Other fees can still apply. Full fee rule
  • Permit review 15 business days to say whether the application is complete. Once it is complete, and if a house already exists on the lot, 60 days to approve or deny it. 15-day completeness rule60-day decision rule

The links go to the full rule, its conditions and its source below.

Garage conversion

  • No setback needed. The city cannot require a setback to convert an existing garage, or to rebuild it in the same place and to the same size. (§66314(d)(7))
  • No replacement parking. The city cannot make you replace the parking spaces the garage provided. (§66314(d)(11))
  • No new utility connection required. If the unit stays within the existing structure (an expansion of up to 150 square feet is allowed for getting in and out), the city, a special district or a water company cannot require a new, separate connection or charge a connection fee for one, unless the ADU is built together with a new house. (§66311.5(d); §66323(a)(1))
  • No solar requirement. Converting a garage into an ADU counts as an addition under the Energy Code, not a new building, so the solar requirement for new buildings does not apply. (Energy Commission; HCD Handbook)

Attached ADU

  • A separate home, not a room addition. State law defines an ADU as a unit with complete, independent facilities for living, sleeping, eating, cooking and sanitation. (§66313(a))
  • Setbacks of four feet at most. The city can require side and rear setbacks, but no more than four feet. A city may also apply front-yard setbacks, though not to block an ADU of at least 800 square feet, and a coastal-zone program can add setback requirements. (§66314(d)(7); HCD Handbook)
  • No solar requirement. An attached ADU counts as an addition under the Energy Code. (Energy Commission)

Detached ADU

  • One is guaranteed on a single-family lot. In a residential or mixed-use zone, the city must approve one new detached ADU with side and rear setbacks of four feet. For that guaranteed unit it may cap the size at 800 square feet and apply a height limit of 16, 18 or 20 feet, depending on the site; your city’s ordinance may allow more. The unit must still meet the building code and the fire and safety requirements for a home. (§66323(a)(2); HCD Handbook)
  • New solar panels required. A newly built detached ADU needs newly installed solar unless an exception applies. The panels can go on the ADU or the main house, or be added to an existing system on the lot; existing panels alone do not count. (Energy Commission; HCD Handbook)
  • It may need its own utility connection. The utility can require a separate connection, with a charge in proportion to the unit’s size or plumbing fixtures. (§66311.5(e))

For every ADU

  • Renting: allowed. You can rent an ADU separately from the house. The city may prohibit rentals shorter than 30 days. (§66314(d)(1); §66315)
  • Selling: generally not on its own. An ADU generally cannot be sold separately from the house, except in the limited cases state law allows. (§66314(d)(1))
  • Living on the property: not required. The city cannot require the owner to live on the property. A junior ADU that shares a bathroom with the house is different: the owner must live in either the main residence or the junior ADU. (§66315; §66333(b))
  • Impact fees: none up to 750 square feet. An ADU of 750 square feet of interior living space or less pays no impact fees. A larger one pays a share of the impact fee for a new home, in proportion to the ADU’s size compared with the main house. (§66311.5(c); HCD Handbook)
  • Other fees can still apply. The impact-fee rule does not cover permit and plan-check fees, school district fees on ADUs over 500 square feet, or utility connection and capacity charges where a separate connection is required. (§66311.5(a), (e); HCD Handbook)
  • Completeness: 15 business days. Within 15 business days of receiving your application, the permitting agency must tell you in writing whether it is complete and list anything missing. If it does not, the application is deemed complete. (§66317(a)(2))
  • Decision: 60 days. When a house already exists on the lot, the permitting agency must approve or deny a complete application within 60 days, or it is deemed approved. A denial must list every correction; a resubmitted application starts a new 60-day period, and a delay you request pauses the clock. If the ADU is applied for together with a new house, the permitting agency may decide the house first. (§66317(a)(3), (b); HCD Handbook)
  • Moving in. A certificate of occupancy from the city is needed before anyone lives in the ADU. (HCD Handbook)

Who an ADU may suit

  • Family close by, with privacy

    Space for a parent, an adult child or a relative, with its own entrance, kitchen and bathroom.

  • Rental income

    A separate unit that could be rented, subject to your city’s current rules on renting ADUs.

  • A garage or yard you can use better

    An existing garage can be converted, or open yard space can take a new unit.

Two ADUs taking shape

The main house stays fixed in both. Choose a detached unit or a garage conversion.

The main house stays exactly as it is while a separate home is built in the back yard.

Detached ADU: Site
Rendered from one scene with a fixed camera. Simplified illustration of a typical project. Not engineering guidance or a promise about a specific property.

Site

What happens
The pad is marked out in the yard, with space kept between the two homes.
What you decide
Where the unit sits and how people reach it.
What must be checked
Setbacks, access for construction and utility routes.

What to check on your property

Four things decide which ADU type is realistic and how much work it takes. Most of them can be answered before anything is designed.

The lot

  • How much yard is left once side and rear setbacks are taken off
  • The garage or other structure you could convert, and the condition of its slab, walls and roof
  • Trees, slope and drainage where a new unit would sit
  • Easements or other restrictions recorded on the property

Utilities

  • Where water, sewer, gas and electrical service enter the property today
  • Whether the electrical panel and sewer line can serve a second home
  • Whether you want separate meters, and whether the utility will require a separate connection
  • For a detached unit: where solar panels could go

Access

  • A route for equipment and materials to the back of the lot
  • Gates, driveways and side yards that limit what can reach the work area
  • A separate entrance for the ADU and a path to it

Local permitting

  • Your city’s ADU ordinance: size, height and design standards
  • Whether your lot is eligible, which the city’s planning department can confirm
  • What the city needs in a submittal and how it is filed
  • Fees and utility connection charges, before you commit

State law limits what a city can require; the city’s own ordinance covers the rest. Confirm both with the city where the property is.

What the work can involve

Every ADU is a small but complete home, so it carries the same systems as a house.

  1. A look at the lot, the yard and any structure you want to convert
  2. Choosing the type: garage conversion, attached or detached
  3. Design of a complete home: kitchen, bathroom and entrance
  4. Utility connections, which may be separate from or shared with the house
  5. Plans reviewed under California and city ADU rules
  6. Construction: foundation or slab work, framing, systems and finishes
  7. Inspections at each stage, then the final walkthrough

What shapes an ADU’s scope

An ADU is small, but its scope follows the same four factors as any home.

Existing property and site

What is already there sets the starting point: the lot’s size and slope, existing structures and their condition, and where water, sewer, gas and power come in.

Questions worth answering

  • Do you have a survey or old plans?
  • Where do utilities enter the property?
  • Is anything on the lot in poor condition?

What it can change: Site preparation, what can be reused, and how far new connections need to run.

For your project: Yard space, setbacks and utility routes decide which ADU type is realistic.

Nobody can price a project from a web page. These are the questions that make a first conversation useful.

What affects ADU cost and timing?

Two ADUs of the same type can cost very differently on two lots. These are the factors the cost calculator asks about, and the ones a site visit confirms.

  • Conversion or new construction

    A garage conversion reuses a structure that is already there; a detached ADU is built from the foundation up. The calculator treats them as separate project types.

  • The site and utilities

    How far water, sewer and power have to run, whether the garage already has plumbing, and the condition of its slab, walls and roof.

  • Design, permits and city review

    Plans and the city’s review come before construction. State law sets the review deadlines, but a resubmitted application starts a new review, and fees and requirements vary by city.

  • Size and finishes

    Square footage and the finish level move the planning range most directly. Above 750 square feet, impact fees can apply.

Try the cost calculator

The calculator on the homepage gives an early planning range for a garage conversion or a detached ADU, based on published California builder pricing. The range comes from the size, the finish level and, for a conversion, your answers about the garage: attached or detached, plumbing, distance to utilities and condition. The city you choose does not change the figure. It does not price attached ADUs.

For these two types the range generally includes design and plans, permits and city fees, construction with a kitchen and bathroom (and the foundation for a detached ADU), and typical utility connections. It generally leaves out furniture, landscaping and financing; unusual sewer, slab or electrical-service problems in a conversion; and, for a detached ADU, unusual site, sewer or electrical-service problems and some city fees on units over 750 square feet.

It is not a quote and does not set a timeline.

ADU questions

Short answers, grouped by project type. Specific rules depend on your property and your city.

Starting an ADU with Castle

  1. 01

    Tell us about the property

    Build the ADU brief (three questions, kept in your browser) or send your details to Castle from the contact page. The city and the type you are considering are enough to begin.

  2. 02

    Bring what you already have

    Photos of the yard or garage, where the utilities enter, and any survey, plans or past permits for the property.

  3. 03

    A first conversation

    We talk through your goals, the property and your questions. Next comes a look at the site and any structure you want to convert, before anything is designed.

Start an ADU brief

Three short questions about your property and priorities. Print the result, or keep it in this browser for later.

Ask about an ADU

Send your project to Castle

A few details are enough. Castle will reply about your project.

Give at least one: email or phone.

Give at least one: email or phone.

Add more project details (optional)
Where are you now?
Any timing to plan around?

Castle uses these details only to reply about your project. They are kept by Castle, not in this browser.

Ask a question

How should we reply?

Contact details and messages are used only to reply to you. They are not saved in this browser.