Plans and permits first. Construction after.

Every project here follows the same order: understand the property, settle the plan and get it approved, then build with inspections along the way. The details change by project; the order does not.

Three phases, six steps

  1. Your property

    Before anything is drawn.

    1. Step 1

      First conversation

      What happens
      You talk through your goals, the property and your questions.
      What you decide
      Which routes are worth looking at.
      What is checked
      Nothing yet; this is for understanding, not deciding.
      What comes out of it
      A shared picture of what you want to change.
    2. Step 2

      Site and existing-structure review

      What happens
      The lot and anything already built on it are looked at: size, setbacks, slope, utilities and condition.
      What you decide
      Which route fits the property.
      What is checked
      Conditions that need a survey, soils report or other specialist.
      What comes out of it
      A short list of site conditions to confirm before design.
  2. Your plan

    Settled on paper, then approved.

    1. Step 3

      Design and selections

      What happens
      Layout, exterior, systems and finishes are designed and priced as the plan firms up.
      What you decide
      Rooms, layout, windows and the level of finishes.
      What is checked
      That the design fits the site conditions and your priorities.
      What comes out of it
      A design ready for engineering and permit drawings.
    2. Step 4

      Permits and plan check

      What happens
      The drawings go to the city. Plan check may ask for changes before approval.
      What you decide
      How to respond to any changes the city requests.
      What is checked
      Code compliance, by the city.
      What comes out of it
      An approved permit set: the drawings the build follows.
  3. Your build

    Only after approval.

    1. Step 5

      Construction and inspections

      What happens
      Foundation, framing, enclosure, systems and finishes, in that order.
      What you decide
      Final selections as each stage arrives. Any changes are agreed in writing before work continues.
      What is checked
      City inspections at the stages the permit requires.
      What comes out of it
      Work that has passed each inspection.
    2. Step 6

      Final inspection and walkthrough

      What happens
      The city’s final inspection, then a walkthrough of the finished project together.
      What you decide
      The punch list of anything to finish or correct.
      What is checked
      That everything on the plans was built.
      What comes out of it
      Your finished project.

See the build phase

The last phase, shown the same way for five kinds of project. Choose one and a stage.

The existing house stays exactly as it is while a new wing takes shape beside it.

Addition: Connection
Rendered from one scene with a fixed camera. Simplified illustration of a typical project. Not engineering guidance or a promise about a specific property.

Connection

What happens
The existing house is measured and the new footprint is marked where it will join.
What you decide
Where the addition connects and how the rooms will flow into it.
What must be checked
Setbacks, lot coverage and the existing structure at the connection.

Inspections you can expect

Inspections are set by the permit and the city. On most residential projects they follow the build in this order.

  1. Foundation, before concrete is placed
  2. Framing, once the structure is up
  3. Rough plumbing, electrical and mechanical, before walls close
  4. Insulation, where required
  5. Final inspection

The exact list depends on the project and the city.

Process questions

Short answers, grouped by project type. Specific rules depend on your property and your city.

Start with your own project

The project brief puts your goal, property stage and priorities in one place, ready for a first conversation.

Contact us

Send your project to Castle

A few details are enough. Castle will reply about your project.

Give at least one: email or phone.

Give at least one: email or phone.

Add more project details (optional)
Where are you now?
Any timing to plan around?

Castle uses these details only to reply about your project. They are kept by Castle, not in this browser.

Ask a question

How should we reply?

Contact details and messages are used only to reply to you. They are not saved in this browser.